Vard Launches Flexible Subsea Construction Vessel for Dong Fang Offshore
Guest Contributor
Contributor
Vard has launched Orient Trailblazer, a flexible subsea construction vessel it is building for Dong Fang Offshore in Taiwan for the offshore wind market. Due for delivery in the second quarter of 2027, the vessel will undertake multiple tasks including subsea inspection, cable installation and repair, cable burial and foundation installation work. Measuring 120.7 metres with a 250-tonne active heave compensated crane, the vessel is optimised to meet the growing demands of offshore wind and energy projects in the Asia Pacific region.
Details of the Launch
Vard has launched a new construction vessel. It is named Orient Trailblazer. The vessel is a subsea construction vessel. It is being built for Dong Fang Offshore. This is a Taiwanese company.
The launch marks an important step. The vessel is due for delivery in 2027. This will be in the second quarter. It joins Dong Fang Offshore's fleet. The company continues to grow its fleet rapidly.
The Vessel's Versatility
The vessel is designed for multiple tasks. It targets the evolving energy market. This is in the Asia Pacific region. It can undertake a range of work scopes. This versatility is central to its design.
These work scopes are extensive. They include subsea inspection and intervention. Cable installation and repair feature too. Cable burial using specialised tools is included. Foundation installation work is also within scope.
The Vessel Specifications
The vessel has substantial dimensions. It measures 120.7 metres in length. Its beam is 23 metres. It has a deadweight of 5,300 tonnes. These dimensions support its varied roles.
The vessel offers further capabilities. It can provide offshore accommodation. Walk-to-work scopes are supported. Subsea module handling is possible. Survey campaigns and decommissioning also feature.
Read more: https://oceaneconomist.com/articles/eco-wave-power-digital-twin-platform
The Key Equipment
The vessel has significant lifting capability. This is based on a 250-tonne crane. The crane is active heave compensated. Ample accommodation supports operations. This suits demanding offshore projects.
The vessel is highly flexible in configuration. It can carry a modular cable-lay spread. This has 2,500-tonne capacity. Two work-class ROVs are included. A moonpool can be installed if required.
The Technical Features
The vessel enables smooth task transitions. It shifts between cable-laying and repair. Subsea construction is also supported. Inspection and maintenance feature too. Topside support is another capability.
The vessel has advanced technical systems. It has a large unobstructed deck area. Removable bulwarks suit multiple missions. DP2 dynamic positioning aids station-keeping. Diesel-electric propulsion includes a battery pack.
Significance of the Vessel
The vessel strengthens Dong Fang Offshore's fleet. It marks an important step for the company. It supports rapid fleet growth. The vessel is optimised for regional demands. These span offshore wind and energy projects.
The vessel reflects a collaborative build. Its hull was built in Romania. Completion will occur in Norway. Final outfitting takes place there. Commissioning and delivery follow at the same location.

Guest Contributor
Contributor
This article was contributed by an external writer affiliated with our publication.



