Incat Crowther Designs Fast Response CTV for West Coast Launch

Guest Contributor
Contributor
Canadian operator West Coast Launch has selected Australian naval architect Incat Crowther to design a new fast response workboat and crew transfer vessel for service on British Columbia’s coast. Bracewell Marine in Prince Rupert will build the vessel based on the design of Aurora, a 26-meter passenger and freight vessel Incat Crowther designed for West Coast Launch in 2019. Construction is due to start by the end of 2026, with the vessel entering service by the end of 2027.
The Order
The new vessel was commissioned after Aurora’s strong operational performance since 2019. It will use Aurora’s proven hull form while introducing design upgrades based on West Coast Launch’s operating experience and feedback. Once in service, it will work alongside Aurora on West Coast Launch’s existing routes along the British Columbia coast. Transport Canada will certify the vessel for Canadian-flag operations under Home Trade Class III rules.
Bracewell Marine, also based in Prince Rupert, will build the vessel using Incat Crowther’s digital shipbuilding technology. This provides the shipyard with detailed production information tailored to the project and supports the use of local suppliers. Incat Crowther describes this as enabling sovereign construction, with vessels built domestically rather than imported. Building locally keeps work and spending within the regional economy.
Design and Performance
The aluminium vessel will be 25.8 metres long and 8 metres wide, with a shallow 1.33-metre draft. It will be powered by twin Volvo Penta D16 engines driving fixed-pitch propellers. The vessel will have a service speed of 23 knots and a top speed of 26 knots. West Coast Launch lists Aurora’s maximum speed as 27 knots.
The engines will meet IMO Tier III emissions requirements, which strictly limit nitrogen oxide emissions. The new vessel will have more power than Aurora while delivering lower emissions. Incat Crowther Managing Director North America Grant Pecoraro said the move to Tier III engines brings a meaningful emissions improvement without compromising power or performance. Two 25-kilowatt Northern Lights generator sets will provide onboard electrical power.
Multi-Role Capability
The vessel is designed for multiple roles, with a deck crane offering a 9.5-meter reach and a large storage area with roller door access. Twin swim platforms and an integrated gangway allow safe transfers of passengers and crew. The passenger cabin will seat 100 people and include a kiosk and two bathrooms, with three crew aboard. This combination allows the vessel to carry both people and cargo on the same trip.
The wheelhouse has a wrap-around deck, giving the crew 360-degree visibility. An outdoor staircase connects the wheelhouse directly to the main deck, letting crew move quickly between stations. These features support close-quarters work such as transfers alongside ships. Good visibility is important when operating near large vessels or in poor weather.
Read More: https://oceaneconomist.com/articles/one-seanautics-syria-agency
West Coast Launch’s Operations
West Coast Launch is a family-owned company based in Prince Rupert, offering marine transport, freight, crew transfer, and emergency response services on Canada’s Pacific Northwest coast. It operates a fleet of Transport Canada-certified vessels serving ports, pilots, terminals and coastal communities. Prince Rupert has grown as a major port and energy export hub, increasing demand for marine support services. The new vessel will allow the company to expand these operations.
Captain Doug Davis, head of West Coast Launch, said Aurora has been a reliable and valuable part of the fleet since 2019. He said partnering with Incat Crowther again made sense as the company expands at a critical time. Davis said the new vessel builds on Aurora’s success while giving West Coast Launch more capacity for crew, cargo, survey, response and freight work. The order reflects growing activity along British Columbia’s northern coast.
Refining a Proven Platform
Basing a new vessel on an existing design reduces technical risk and can shorten design and construction time. The operator already knows how the hull performs in local conditions, while improvements can address issues found in service. Pecoraro said the vessel shows how a proven platform can be refined through close collaboration with the operator. He said it has been tailored for the conditions it will face in Canada’s Pacific Northwest.
The project also highlights demand for versatile workboats that can switch between roles. Operators serving remote coastlines need vessels that handle passengers, freight and emergency calls without separate boats for each task. Combining these roles in one vessel can improve fleet use and reduce costs. For Incat Crowther, the order strengthens its presence in the North American workboat market.
Source: Incat Crowther

Guest Contributor
Contributor
This article was contributed by an external writer affiliated with our publication.




